Morris-Shea Piles at LNG Facility
Morris-Shea installed deep foundation piles at the Calcasieu Pass LNG facility.
Morris-Shea Photo Gallery – deep foundation installation – geotech jobsite & equipment – DeWaal Pile, CFA, CIDH, secant wall, cassion
Morris-Shea installed deep foundation piles at the Calcasieu Pass LNG facility.
Morris-Shea installed a reinforcing steel bar and cage in a DeWaal deep foundation pile.
Morris-Shea drove foundation piles for the construction of a residential high rise building in Birmingham, AL.
Morris-Shea utilizes an Automated Monitoring System to assure deep foundation piles are installed to the highest level of quality.
Morris-Shea performed retrofit construction in an Amazon distribution center to accommodate the addition of a mezzanine floor.
Morris-Shea utilized a Fundex CD20D drill rig for retrofit construction in an Amazon distribution center.
Morris-Shea set up a portable concrete plant outside an Amazon distribution center to expedite concrete availability for a retrofit project.
Morris-Shea DeWaal pile was installed at the Mobile, AL Airbus facility as deep foundation for new aircraft manufacturing hanger.
DeWaal rigid inclusions are specified to accommodate the variable density of the top fill. The loose fill, including gravel, silt,…
Morris-Shea installed continuous flight auger pile (CFA) for the new Hewson Hall deep foundation construction at the University of Alabama…
Shea Brothers Mexico, with equipment support from deep foundation contractor Morris-Shea, completed foundation installations at two sites in the new…
Morris-Shea chartered a ship to transport equipment from Mobile, Alabama to the PEMEX job site dock. Five Fundex F3500 drill…