Morris-Shea is a leading geothermal drilling contractor for commercial, institutional, and industrial applications. We bring an advanced fleet of portable drill rigs for the construction of geothermal closed-loop heating and cooling pumps. Morris-Shea rigs ensure vertical borehole stability for well bores up to 12 1/2″ in diameter to specified depths in the most difficult strata.

STORAGE DOME / SILO DEEP FOUNDATION

Morris-Shea, an industry-leading deep foundation contractor, completed installation of approximately 400 H-piles for use as foundation for a storage dome/ silo at the St. Marys Cement plant near Baltimore, Maryland. The completed structure will contain dry cement staged for onloading to specialty ships at the project site’s terminal facility. Morris-Shea fielded a highly experienced team who completed the harborside project on schedule

STEEL PIPE MANUFACTURING PLANT

Morris-Shea, an industry-leading deep foundation contractor, completed installation of two cofferdams at the Berg Pipe facility expansion in Panama City, Florida. The cofferdams will accommodate new pipe-forming technology that upgrades the existing plant’s large diameter steel pipe manufacturing and coating capabilities. Morris-Shea fielded a highly experienced team who completed the harborside project on schedule.

GEOTHERMAL

Morris-Shea is a leading geothermal drilling contractor for commercial, institutional, and industrial applications. We bring an advanced fleet of portable drill rigs for the construction of geothermal closed-loop heating and cooling pumps. Morris-Shea rigs ensure vertical borehole stability for well bores up to 12 1/2″ in diameter to specified depths in the most difficult strata.

SHIPYARD MANUFACTURING FACILITY

Morris-Shea, an industry-leading deep foundation contractor, completed installation of approximately 8,000 DeWaal piles to be used as deep support for the new Austal USA Module Manufacturing Facility. The job site for the single story high bay structure is located at a waterside lot adjacent to Dunlap Drive in Mobile, Alabama. The DeWaal Pile System, a drilled displacement pile, is ideal for use as deep foundation in the harbor’s subsurface high groundwater environment.

STORAGE DOME / SILO DEEP FOUNDATION

Morris-Shea, an industry-leading deep foundation contractor, completed installation of approximately 400 H-piles for use as foundation for a storage dome/ silo at the St. Marys Cement plant near Baltimore, Maryland. The completed structure will contain dry cement staged for onloading to specialty ships at the project site’s terminal facility. Morris-Shea fielded a highly experienced team who completed the harborside project on schedule
Deep Foundation Contractor Morris-Shea

PROJECT: MULTISTORY BUILDING FOUNDATION

Deep foundation piles for the Ritz-Carlton Residences in Bonita Springs, Florida will support two 20 story towers and a parking podium. Morris-Shea installed 1,406 De-Waal piles throughout the project site. Project specifica-tions required two successful 14 inch and two 18 inch static load tests and one lateral load test. The Morris-Shea crew completed the project one month early. Two advanced Morris-Shea rigs, including the larg-est deep foundation multifunctional drill rig in use in North America, were utilized for this project. DeWaal DWP piles were drilled to depths up to 133 feet and then chipped and cut upon completion of drilling. Pile installation was completed on December 19, 2023. Pile cutting/chipping commenced on November 27, 2023 and concluded on January 20, 2024. Morris-Shea com-pleted pile cutting ahead of schedule.
Deep Foundation Contractor Morris-Shea

PROJECT: MULTISTORY BUILDING FOUNDATION

Deep foundation piles for the Ritz-Carlton Residences in Bonita Springs, Florida will support two 20 story towers and a parking podium. Morris-Shea installed 1,406 De-Waal piles throughout the project site. Project specifications required two successful 14 inch and two 18 inch static load tests and one lateral load test. The Morris-Shea crew completed the project one month early.