Denver, CO
Other Applications
CUMMINS WALESBORO TECHNICAL FACILITY
Morris-Shea drilled 350 geothermal boreholes for the installation of 140,000 linear feet of ground loop heat exchanger piping at the Cummins Walesboro Technical Facility in Columbus, Indiana. Morris-Shea mobilized two advanced drill rigs, a CPT test unit and other support equipment to the plant expansion job site. The team drilled 4.5 inch diameter boreholes to a depth of 400 feet from drilling grade. Geothermal construction began in mid-July and was completed on schedule on November 24, 2025.
SHIPYARD MANUFACTURING FACILITY
Morris-Shea, an industry-leading deep foundation contractor, completed installation of approximately 8,000 DeWaal piles to be used as deep support for the new Austal USA Module Manufacturing Facility. The job site for the single story high bay structure is located at a waterside lot adjacent to Dunlap Drive in Mobile, Alabama. The DeWaal Pile System, a drilled displacement pile, is ideal for use as deep foundation in the harbor’s subsurface high groundwater environment.
SPECIALTY MICROPILE ANCHORS
Morris-Shea micropile anchors add stability when tied to the rock subsurface.