
The Dos Bocas Refinery Project required the installation of 437 32 inch diameter and 193 1 meter diameter Continuous Flight Auger (CFA) piles drilled to a depth of 100 feet.
The Dos Bocas Refinery Project required the installation of 437 32 inch diameter and 193 1 meter diameter Continuous Flight Auger (CFA) piles drilled to a depth of 100 feet.