Drilled shafts (caisson) are often installed from temporary work platform at marine jobsites. Morris-Shea pioneered the use of double-wall sectional casing using the high torque available with our rigs to install “cased ahead” shafts. The cased ahead construction method removes the need for slurries in many cases and results in less soil disturbance, giving higher unit shaft friction values.
Other Applications
Morris-Shea soil mixing trencher
Morris-Shea soil mixing trencher at Novalis aluminum plant job site in Bay Minette, Alabama.
Morris-Shea portable concrete plant
Morris-Shea portable concrete plant at Novalis Bay Minette, Alabama job site.
Morris-Shea drill rigs
Morris-Shea drill rigs installing piles at aluminum plant in Bay Minette, Alabama.