Morris-Shea installed 20” diameter pipe piles with 0.5” wall thickness to depths up to 160-feet as support for the Pop-Darr station and five tower foundations located on Disney World’s Hourglass Lake. The piles were initially driven with a vibratory hammer and then seated with a Delmag D-25 direct drive diesel hammer.
Other Applications
Deep Foundation for Mixed-Use Building
Morris-Shea installed 2,980 DeWaal piles as a rigid inclusion deep foundation for the initial construction phase of a seven story mixed-use building in Everett, MA.
Drilled Shafts in Bay Minette, Al
Drilled Shafts in Bay Minette, Al
Outer casing being lowered by crane into drilled shaft.
Drilled Shaft at Auburn University Stadium
Drilled Shaft at Auburn University Stadium.
Steel reinforcing cage being installed in drilled shaft deep foundation.